References
Architecture -
Engineering

Sophia Antipolis offices

Positive energy and low consumption building

Architecture -
Engineering

Creation of an office building and its underground car parks in the reception area of ​​the activities of the Parc de Sophia Antipolis, overlooking the baous and the Mercantour national park.

See technical information

The building will offer 3,600 m² of offices spread over 4 floors and will offer 900 m² of terraces, external extensions of the offices. This project is part of the guideline which makes Sophia Antipolis an attractive space, endowing itself with a new urbanity, based on increasing densities.

The missions include:

  • TCE engineering
  • The use of interoperability methodologies to analyze the structure and sizing of frames from the digital architectural model
  • The photovoltaic study
  • The study of low-consumption buildings
  • Construction economics
  • BIM methodology

3D from our architects...

 
©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

... And their achievement!

©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

 

 

©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

 

 
©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

 

 

©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

 

©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

 

 

©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

 

 

©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

 

©Kardham_Valimmo_Partenariat Mazzares Architectes_Biot Sophia Antipolis_Photo Remy Schejbal

 

Technical informations

 

Location Sophia Antipolis (06)
Project owner Valimmo
Partners Mazzarese Architectes, Kardham Ingénierie/TCE
Mission Complète
Surface 3 600 m² et 900 m² de terrasse
Price 5,7 M€
Year 2021
Environmental labels BEPOS RT 2012
BIM methodology